Acceleration
The PM instructs the Contractor to submit a quotation for acceleration.
Acceleration is optional — the Contractor provides a quotation, but the PM decides whether to accept it.
Acceleration is not a CE. If the Contractor accelerates voluntarily without instruction, the cost is not recoverable.