CE — No Reply to a Communication
The Project Manager or the Supervisor does not reply to a communication from the Contractor within the period required by the contract.
Failure to reply within the contractual period (e.g. acceptance, instruction or consent) is a compensation event.
Keep records of communications and the required reply periods.