Tests — Plant
The Supervisor tests Plant and Equipment to confirm they meet the Works Information. Tests include performance and operational testing.
Plant tests verify that installed equipment functions correctly. The Contractor provides operating instructions and trained personnel for testing.
Performance testing may require specific conditions (load, temperature, duration). Ensure the Works Information or test specification defines the acceptance criteria clearly.